Stage of construction: permission to use A Gated complex in a quiet location about 500 m from the beachThe complex will be situated in a green area, about 200 m from the Aqua Park and not far from the south beach.
The complex consists of a two ...
Bedrooms: 2, Floor: 4, Floors: 4, reinforced concrete structure with brickwork, Completion date: 06.2024, Distant sea view, Stage of construction: construction completed including all installation
Bedrooms: 2, Floor: 1, Floors: 4, reinforced concrete structure, Completion date: 03.2024, Stage of construction: construction completed including all installation