Bedrooms: 1, Floor: 3, Floors: 4, brick / after 2010, First line without sea view, Stage of construction: permission to use
We may have offers that match your search but are not officially announced for privacy reasons. If you would like to receive information about our confidential offers, please fill out the request form.
Yard area: 1 m2, Bedrooms: 2, Floors: 2, Distant sea view, Stage of construction: permission to use Preliminary information for this offer you can receive from the real estate agent listed as contact.
Bedrooms: 1, Floor: 1, Floors: 4, brick, Completion date: 07.2025, First line without sea view, Stage of construction: construction completed including all installation
Bedrooms: 1, Floor: 3, Floors: 4, brick, Completion date: 07.2025, First line without sea view, Stage of construction: construction completed including all installation
Bedrooms: no separate bedroom, Floor: ground floor, Floors: 4, brick / after 2010, First line without sea view, Stage of construction: permission to use
Yard area: 1200 m2, Rooms: , Floors: 3, Stage of construction: permission to use Perfect location - near the large beach of Kavatsi, in a quiet street, among beautiful landscaped garden with swimming pool, parking lot, restaurant and children playground.The hotel is three storey, ...
Location: The property is situated in Misarya neighbourhood, Sozopol town.
The plot is facing two streets and has year-round access. It is in a residential construction zone with low building /up to 10 ...
Distant sea view, Stage of construction: permission to use Location:The complex Sveta Sofia is situated in the resort part of Sozopol, 100 m away from beach, in a region with well-developed infrastructure.Project:The complex consists of four self-contained four-storey ...
Location: the plot is situated in an area with excellent transport links, in the new part of town, between the central beach and Harmani beach. There are shops and a park near by. Description: the terrain ...
Bedrooms: 2, Floor: ground floor, Floors: 4, brick, Completion date: 07.2023, First line without sea view, Stage of construction: construction completed including all installation