We may have offers that match your search but are not officially announced for privacy reasons. If you would like to receive information about our confidential offers, please fill out the request form.
Completion date: 12.2025, First line with sea view, Stage of construction: elevation +0.00 Confidential offering! For more information about this offer, please contact the agent listed above.
Stage of construction: permission to use A Gated complex in a quiet location about 500 m from the beachThe complex will be situated in a green area, about 200 m from the Aqua Park and not far from the south beach.
The complex consists of a two ...
Bedrooms: no separate bedroom, Floor: 5, Floors: 5, reinforced concrete structure with brickwork / after 2010, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction
Floor: 2, Floors: 4, brick, First line without sea view, Stage of construction: permission to use Confidential offering! For more information about this offer, please contact the agent listed above.
Bedrooms: 1, Floor: 2, Floors: 5, reinforced concrete structure with hanging facade and brickwork / after 2010, Stage of construction: permission to use
Bedrooms: 2, Floor: 5, Floors: 5, reinforced concrete structure with hanging facade / after 2010, First line with sea view, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 4, Floors: 5, reinforced concrete structure with brickwork / after 2010, Stage of construction: permission to use
Bedrooms: 1, Floor: 1, Floors: 6, reinforced concrete structure with brickwork / after 2000, First line with sea view, Stage of construction: permission to use